Dushanbe Water Treatment
logo

This project was based on a Design, Supply and Installation contract. The overall goal of the Project was to ensure a sustainable, continuous and hygienically acceptable supply of drinking water according to international standards at socially acceptable costs for the residents of Dushanbe, Capital of Tajikistan. The design flow for the rehabilitation of SAM Filtration Plant is Min. 5.000 m3/h (120,000 m3/day). The design is unique due to the lack of space in the territory of Employer. In this regard the treated water reservoir which is in fact a pond to provide suitable contact time of chlorine solution with water is constructed below the filter building. Capacity of the contact reservoir is 4000 m3. Treated water from the reservoir flows directly from the underneath of each filter to the reservoir. The project started in September 2014 and ended in June 2017.


 

CONTACT US
NEWS & MEDIA
Shadegan Steel Water Supply Project Completed
Mobin Petrochemical Demin Water Project Completed
Tehran 7th WTP Second Module Project Awarded
Azad Dam Pump Stations Project Awarded
Samarkhand and Bukhara Sewage Project Awarded
  • Follow us on:fbtG+r
  • T
    F
    CATALOGUES
    CAREERS
    Join Us At Shimbar
    PDF
    PDF1
    Shimbar 2014 English Catalogue
    Shimbar Profile
    21, 35th st., Vozara ave., Tehran 15168, Iran
    +98 21 88 79 6761
    +98 21 88 79 5757
    info@shimbar.com
    PROJECT HIGHLIGHTS
    Dushanbeside